A wood framed 145m2 addition to the existing Water Treatment Plant sat on a slab-on-grade foundation. The scope of work included upgrades to the chemical rooms, filtration membranes and the replacement of the vertical turbine fire pumps. Also included in the scope of work was the supply and installation of new distribution pipes, upgrades to the existing chemical feed system and CIP room modifications. Now complete, the Water Treatment Plant is capable of servicing the entire community with fresh water at a rate of 1,425 m3 per day.
Project
Manto Sipi Water Treatment Plant
- LocationGod’s River First Nation, MB
- Completion2018
- ServicesCommercial